8. V102 to V103 upgrade procedure

8.1. Prerequisites

To install the V2.5.3.103 update:

  • The GCenter must be running V2.5.3.102-HF3 or higher

  • The GCap will need to be version V2.5.4.0 or higher

  • If you have any questions about these items, please contact the Gatewatcher Technical Support

    Important

    It is highly recommended to have an iDRAC type connection in order to be able to connect post-upgrade if a problem occurs during the process. Otherwise, you'll need a physical access to the equipment (screen, keyboard).

    Important

    Before proceeding with the update, it is strongly recommended to backup the GCenter configuration in the Administrators > Backup / Restore > Operations menu and save the file to an external server in a directory indicating the current GCenter version (example: 2.5.3.102-XXXX-HFX).


8.2. Retained data

All the GCenter configuration and data are retained.


8.3. Installation procedure with data retention

  1. Make sure the GCap probes are in version V2.5.4.0 or higher, otherwise refer to the following update procedure: https://releases.gatewatcher.com/en/gcap/2.5.4/V0/8_upgrade_procedure.html

  2. Download the newly available version of the GCenter and the associated sha256 on the https://update.gatewatcher.com/upgrade/ platform (directory 2.5.3.103).

  3. Check the image with the associated sha256.

  4. Connect to the GCenter WebUI and go to the menu Admin > GUM > Software update.

  5. In the Uploading a new software update section, click on the Click to upload button, select the new GCenter version previously uploaded and click Submit.

  6. Connect to the GCap with the SSH account setup.

  7. Shut down the monitoring engine with the following command: monitoring-engine stop.

  8. Change the compatibility mode using the following command: set compatibility-mode 2.5.3.103.

  9. Start the monitoring engine with the following command: monitoring-engine start.

  10. In the Saved package list section, at the location of the previously sent update, click on the Apply button.

  11. Once the operation is complete, restart the GCenter by connecting via SSH with the setup account and then going to the Restart menu.

  12. Once the GCenter is restarted, connect to the WebUI and check whether new events appear in the Hunting section (Kibana interface).